NHPC Limited Recruitment For Trainee Engineer –67 Posts |Last Date:17-01-2022

Organization Name:

NHPC Limited

Advertisement No:

NH/Rectt. /04/ 2021

Name of The Post:

Trainee Engineer

Job Description:

NHPC offers exciting opportunities and challenges to learn and grow. The company fosters excellent working environment and has attractive compensation package. To support its high growth trajectory, NHPC is looking for High Performing, Dynamic & Achievement-Oriented young Graduate Engineers and Professionals with bright academic record to join the organization as

Number of the posts: 67

67 Posts

Pay Scale:

(E2)/ 50,000 – 3% – 1,60,000 (IDA)

Age Limit:

30 years

Education/Qualification:

Full time regular Bachelor’s Degree in Engineering / Technology / B.Sc.(Engineering) Degree in Civil Discipline from recognized Indian University / Institute approved by AICTE with minimum 60% marks
or equivalent grade or AMIE (enrollment upto 31.05.2013) with minimum 60% marks or equivalent
grade.

Apply Mode:

Online

Job Location:

Haryana

About Organization :

As on date NHPC Limited has become the largest organization for hydropower development in India, with capabilities to undertake all the activities from conceptualization to commissioning in relation to setting up of hydro projects. NHPC Limited has also diversified in the field of Solar & Wind power. NHPC Limited presently has an installation base of 7071.2 MW from 24 power stations including 2 nos projects in JV mode. Considering the impediments faced during execution of these projects such as unfavourable geological conditions, difficult law and order problems, inaccessible and remote locations, the achievement so far is commendable. NHPC is presently engaged in the construction of 9 projects aggregating to a total installed capacity of 5999 MW which includes 2 hydro electric projects viz., 2000 MW Subansiri Lower HEP and 800 MW Parbati-II HEP and 1 solar Project of 40MW at Odisha being executed on ownership basis and 5 hydro projects and 1 solar project being executed through Subsidiary/ JV Companies viz., 500 MW Teesta-VI HE Project, 1000 MW Pakal Dul HE Project, 624 MW Kiru HE Project, 850 MW Ratle HE Project, 120 MW Rangit-IV HE Project and 65 MW Kalpi Solar Project. In addition, 15 Projects with aggregate capacity of 10787.1 MW are under clearance stage which includes 11 Schemes of NHPC’s own and 04 in JV mode. Further, 3 projects with aggregate capacity of 1130 MW are in S&I stage.

Important Dates:

22-12-2021

Last Date:

17-01-2022

Note:

For more information about Job please go through the official notification

Click Here for Official Notification

Click Here to Apply

Click Here for Official Website

 

 

 

 

 

 

Leave a Reply

Your email address will not be published. Required fields are marked *